Homepage
English (World)
Български Bosanski Čeština Dansk Deutsch Ελληνικά Español Suomi Français Hrvatski Magyar Italiano Қазақ тілі Lietuvių Latviešu Nederlands Polski Português Português do Brasil Română Slovenčina Slovenščina Shqip Svenska Türkçe Українська Tiếng Việt

Find the answers to your questions

  1. Homepage
  2. UPservice
  3. UPS
  4. Trimod HE

Trimod HE

  • How is the SNMP adapter configured?
  • Is the E.P.O. circuit set to NC/ NO?
  • How do you set the output frequency?
  • Are the products parallel?
  • What are the correct steps to follow for proper commissioning
  • Do manual bypass operations involve switching off the load?
  • How do you set up additional batteries?
  • What configurations does the UPS with dual inputs require?
  • How is the back-feed realised?
  • Is it necessary to install UPSs in ventilated rooms?
  • How do you set the range of the PLL?
  • Does the legislation provide for the use of back-feed protection?
  • What are the ideal environmental installation conditions
  • Is it compulsory to install the E.P.O. circuit?
  • Do batteries release flammable gases?
  • Why does the UPS not switch on if I only close the mains fuses?
  • Why does the display flash when the generator is switched on?
  • How do you set the output voltage?
  • Where is the accessory kit located?
  • Where should the ec15 connector be plugged in?
  • Do the battery settings have to be changed?
  • Do batteries have to be configured?
  • What is the recommended cable cross-section?
  • How do you set the output voltage?
  • How are the jumpers configured in the terminal box?
  • Where can I find the menu to configure the inverter?
  • What is the correct differential protection for UPSs?
  • Why does the UPS display the "start up error"?
  • When can I close the battery fuses?
  • What is the correct sequence for the first ignition?
  • Next ›
  • Last »
Legal notice legrand.com Cookies management
Powered by Zendesk