Before proceeding with the first power-up, it is recommended to check the system, electrical connections including signal cable tightening verification, power cable tightening verification, and installation environment. Subsequently, you can proceed with the first power-up and general UPS verification, which includes: synchronization verification, network/Inverter switching and vice versa, bypass test, operation verification, options, battery autotest execution, test with generator if present. Autonomy test with actual load – battery charger, UPS measurements control.
Find the answers to your questions
What are the correct steps to follow for proper commissioning?