Homepage
English (World)
Български Bosanski Čeština Dansk Deutsch Ελληνικά Español Suomi Français Hrvatski Magyar Italiano Қазақ тілі Lietuvių Latviešu Nederlands Polski Português Português do Brasil Română Slovenčina Slovenščina Shqip Svenska Türkçe Українська Tiếng Việt

Find the answers to your questions

  1. Homepage
  2. UPservice
  3. UPS
  4. Keor SPE RT
Questions in this section

Keor SPE RT

  • Is it mandatory to install the E.P.O. circuit?
  • Do batteries need to be configured?
  • What is the recommended cable section?
  • Does regulation require Back-feed protection use?
  • Do manual Bypass operations cause load shutdown?
  • Are the products parallelable?
  • Do battery settings need to be changed?
  • Do batteries release flammable gases?
  • What are the correct steps for proper commissioning?
  • What does “LOC” mean?

Do manual Bypass operations cause load shutdown?

No.

Did this article help you ?

Thanks for your feedback !
Have more questions? Submit a request

Can not find the answer to your questions ?

Our Customer Service is here to help you
Contact us
Legal notice legrand.com Cookies management
Powered by Zendesk